2012 Environmental Information Disclosure
Classification: Industry Focus
Release time: 2013-09-22
Summary:
2012Annual Environmental Information Disclosure
Hunan Fengri Power Electric Co., Ltd. in 2000Year 7In July, an environmental impact assessment was conducted and approved by the Changsha Municipal Environmental Protection Bureau, and the environmental "three simultaneous" acceptance was passed. It has successively passed ISO9001, ISO14001 and OHS18001 certifications. In 2012, it passed the acceptance of the Changsha Municipal Safety Supervision Bureau's occupational health demonstration enterprise. In 2012, it carried out clean production audits and passed the clean production acceptance organized by the Hunan Provincial Environmental Protection Department.
The company has established an environmental safety department and an environmental management committee, established an environmental management system, and formulatedenvironmental pollution accident emergency planand other environmental management systems. Regular environmental inspections and publicity and education training are carried out, and environmental equipment operates stably.
(1) Company's environmental policy: Everyone cares about the environment, everyone abides by the laws and regulations. Strictly enforce prevention and control, creating blue sky and clear water.
Company's occupational health and safety policy: Focus on people-oriented, prevent accidents from happening. Prevent and control occupational hazards, and care for health and safety.
(2) Company's annual environmental goals:
1Ensure that the target for the good condition rate of environmental protection equipment is 100%.。
2The operating rate of environmental protection equipment reaches the target of 100%.。
3The emission rate of industrial waste gas is 100%.After treatment, the PH value of industrial wastewaterreaches 6-9 and is recycled. Industrial waste gas is discharged up to standard, and the factory boundary noise complies with the secondary standard of the "Noise Standard for Industrial Enterprises' Boundaries".
4Strengthen the management of hazardous solid waste, with a hazardous solid waste collection rate of 100%.Workshops and teams uniformly collect hazardous solid waste and send it to the hazardous waste warehouse. The supply department contacts qualified units for recycling and keeps timely records of inbound and outbound goods.
(3)Annual environmental investment (2012year): A total investment of 2000more than ten thousand yuan.
The clear water and sewage pipes have been comprehensively renovated, and the clear and sewage separation has been completely realized. The lead-acid waste water has been collected and recycled, greatly reducing the cost of sewage treatment and water consumption. Waste liquid recycling equipment is used to recycle coating waste liquid. Battery cleaning machines are purchased to automatically clean the surface of batteries, and the cleaning water is recycled. Bathrooms and changing rooms are established, bathing facilities are installed, and anti-corrosion and anti-slip measures are taken. Employees are required to take a shower before leaving work, an industrial washing machine is provided, and special personnel are arranged to wash work clothes to prevent secondary pollution. 180m3rainwater pool and pipeline network are set up to collect primary rainwater in the plant area, and then pumped back to the company's wastewater treatment plant for treatment using fluoroplastic pumps. Effectively collects the primary rainwater containing lead from the production area, reducing the discharge of lead pollutants in rainwater.
The lead supply system of the casting plate is renovated to implement centralized lead supply. The lead melting system of the lead powder line is changed to mechanical extrusion and cutting, eliminating the generation of lead slag and lead smoke, and greatly reducing energy consumption. The lead powder group is equipped with corresponding dust collectors; the filing machine is renovated, and the original filing machine is replaced with a fully enclosed filing machine. The filing group adds a combined dust removal and environmental protection equipment to control the lead dust in the production process to the minimum range, effectively reducing the secondary dispersion of dust, and reducing the noise and lead dust affecting workers. The production efficiency is improved. Automatic casting and welding machines are purchased to reduce lead loss, reduce the harm of lead operation to employees, and reduce the labor intensity of workers. The waste gas treatment system is improved, the original baffle absorption purifier of the casting plate group is eliminated, and the advanced HKE25 in the industry is used.type lead smoke purifier; the assembly line adds welding lead smoke treatment equipment to treat welding lead smoke separately. The efficiency of treating lead smoke and lead dust in the casting plate group, lead powder group, filing group and assembly line is improved to 99%.or more, reducing the emission of lead smoke and lead dust.
The company's solid waste is general solid waste (domestic garbage) and hazardous solid waste (lead mud, lead slag).A special fully enclosed hazardous waste warehouse has been established. The warehouse floor has been treated with anti-corrosion, and warning signs are set up, managed by a special person; lead dust, lead slag and lead mud generated in each process are collected by the workshop team using covered special iron buckets and clearly marked, uniformly sent to the hazardous solid waste warehouse for storage, preventing leakage and dispersion; the supply department establishes sales records and inventory records, and manages the hazardous waste entry and exit separately; improves the approval procedures for hazardous waste transfer, and is handled by Anhui Huaxin Lead Industry Co., Ltd., a company with recycling and treatment qualifications, and a seven-联单 is issued.General solid waste is disposed of by the industrial park city management.
Upgrade internalization equipment, update chargers with high power factor and inverter function,and matching acid adding machine, cold acid machine, charging tank to improve production efficiency and reduce energy consumption.
According to the "Entry Conditions for Lead-Acid Batteries" and the "Guiding Catalogue for Industrial Structure Adjustment (2011year edition)", the company has successfully developed a new type of tubular valve-regulated sealed lead-acid battery, which has been put into production and used in mining locomotives. It is developing a winding lead-acid battery, and has purchased continuous casting and rolling production lines, grid punching equipment, plate grid lug punching equipment, pole group winding equipment, pole group casting and welding production lines, through-wall welding equipment, shell heat sealing equipment, etc.
(4) Main pollutants and emission conditions:
Every year, the Changsha Municipal Environmental Monitoring Center conducts on-site monitoring of the company's environment, and all indicators meet the emission standards. Lead smoke, lead dust, and sulfuric acid mist meet GB162971996"Comprehensive Emission Standard for Air Pollutants" secondary standard, industrial wastewater is recycled, and domestic sewage is treated to meet the standard after three-stage septic tank treatment ("Comprehensive Discharge Standard for Wastewater" (GB89781996) tertiary standard) and discharged into the industrial park sewage pipeline network.Noise: "Emission Standard for Environmental Noise at the Boundaries of Industrial Enterprises" (GB12348 2008)among 3Class sound environment functional area standard.
(5) Company's compliance status:
The company strictly abides by national, provincial, and municipal environmental protection laws, regulations, and rules, actively practices its social responsibility in environmental protection, and achieves the annual environmental goal of continuous and stable compliance emissions and zero environmental pollution accidents through increased investment in environmental protection and strengthened environmental management. It has not received any administrative penalties for environmental protection throughout the year.No major or above environmental pollution accidents or major ecological damage incidents have occurred. No orders have been issued for time-limited treatment, production restriction, emission reduction, or shutdown for rectification. No penalties have been imposed by the Ministry of Ecology and Environment or provincial-level environmental protection departments.
Key words: 2012 Environmental Information Disclosure
Other News Centres
Previous: 2013 Environmental Report
The next one: No more!
Liuyang - Hunan - China
+86-731-83219796
fengri@fengri.com
